Friday, January 08, 2016

Sound & Crack Isolation in Dubai



Click on photos to enlarge

LATICRETE CEO David Rothberg is seen here in Dubai at the Jumeirah Naseem Hotel construction site where 450 luxury hotel rooms are having marble installed with LATICRETE 125 Sound & Crack Isolation to control cracks transmitting through the expensive stone and minimize the amount of impact noise heard in the rooms below.

In the background is the world famous 7 star Burj al Arab Hotel - Rothberg and LATICRETE were on that project too back in 1999!

Labels: , , , , , , ,

Wednesday, September 29, 2010

An Incredible Swimming Pool Project


Marina Bay Sands Skypark
Singapore
Project Area: 2300 m² - 24,000 Sq Ft
Project Description: The Sands SkyPark sits on top of the three hotel towers at Marina Bay Sands at the 57th floor level.  The project consists of 3 jacuzzi & 3 large pools.

Install Date: Early 2010
Product(s) Used:
LATAPOXY 300 Adhesive
LATICRETE 211 E Powder
LATICRETE 226 Thick Bed Mortar
LATICRETE 3701 Mortar Admix
LATICRETE 4237 E Latex Additive
LATICRETE HydroBan
LATICRETE Latasil(TM)

Substrate: Metal / Steel
Application Type: Swimming Pool
Finish Type: Ceramic Tile, Glass Tile & Glass Mosaic Tile

If you would like to read more about this incredible project send me an email - hbrothberg@laticrete.com - and I'll send you an interesting document about this project.


Labels: , , ,